Fallen or Tilted Stones

Marker-broken-02.jpeg

A large headstone that broke off below the surface

Many early tablet style grave markers are installed by simply embedding the stone in the ground, with up to a third of the stone below ground. Over time, shifting soil conditions and external forces can cause these markers to tilt or fall over.

In other cases, weathering and damage can cause a stone can weaken enough to fracture at the stress point where the stone is supported by the ground or a base. When this happens, the top of the stone ends up lying flat on the ground with a piece left below the surface or embedded in the base.

These three situations can require different approaches for repair and resetting.

Resetting into the Ground

This video from the National Center for Preservation Technology & Training provides a great overview of how to reset ground-supported headstones.

Marker-broken.jpeg

A broken marker and the piece of stone recovered from below the surface

In general, the process involves the following steps:

  • Move the fallen stone a short distance to make space for expanding the hole
  • If the stone has broken off, try using a thin probe to find the piece still embedded in the ground. This piece can sometimes be a foot or more below the surface, depending on the total size of the stone. If enough of the stone remains whole above ground, it may be reset without reattaching the broken lower section.
  • Place a tarp or piece of plywood nearby to hold dirt removed from the hole.
  • Widen and deepen the hole for the stone as needed to achieve the desired height. Add 3-4 inches to allow space for a gravel bed below the stone.
  • Broken stones may need to be measured to ensure the engraved section remains visible above ground. If there is not enough stone remaining below the engraving to ensure a stable position in the ground, you may need to consider constructing a new concrete base for the stone.
  • Once the desired depth is reached, add 3-4 inches of gravel to the bottom of the hole and tamp it down.
  • Return the marker to the hole. If the stone is large or heavy, use a hoist to raise the stone and lower it into place.
  • Use a level to adjust the stone and add gravel as needed. Once level, add 3-4 inches of gravel around the stone to hold it in place. Tamp down the gravel with a piece of timber to avoid damaging the stone.
  • Fill the rest of the hole with sand and soil, and replace sod if possible.
  • Once the stone is completely reset, it should be cleaned following the steps outlined in our grave marker cleaning guide.